45 dreams – Initial Outline:

After collecting and sorting 3,000 + Twitter dreams of Donald Trump I have a rough outline for the project. Next step is to sort through the “long form” dreams here on the blog  and add them to the discussion. I had imagined this to be an article, but I have resigned myself to the reality that is likely a book.

OUTLINE/CATEGORIES/CHAPTERS:

 

  1. Grandiosity/Hubris/Inflation
  2. Debasement/Deflation
    1. Incompetence
    2. Hair
    3. Dementia
    4. Disgust
  1. Infantilization
  2. Management/Handling
  3. Marketplace
    1. Food
    2. Fast Food
    3. Walmart
  1. Infiltration/Contamination
    1. Daily Life
    2. Church
    3. Work/Employment/Boss
    4. Sports
    5. School
    6. Resisting contamination
  1. Violated Norms and Taboos
    1. Crime and Arrest
    2. Psychopathy
    3. Against Nature
    4. Aliens
    5. Pee
  1. Propaganda
    1. Re-education
    2. Double-speak
    3. Pan-opticon
  1. Undoing
    1. Impeachment
    2. Arrest
    3. Resignation
    4. Death
  1. Sex
    1. Sexual Abuse
    2. Misogyny
    3. Seduction
    4. Mothers
  1. Community/Familial Discord/Polarization
    1. Family
    2. Community
    3. Fathers (subset)
  1. Nuclear War/Apocalypse
  2. Authoritarianism
    1. Dystopia
    2. Breakdown/Disaster
  1. Approval/Identification
    1. Fathers (subset)
  1. Visions/Prophesies
  2. Bots
  3. Social Media
  4. Unconscious Alliance/Collaboration
    1. Shadow content
    2. Identification
    3. Perks/Privileges/Benefits
    4. Relatives and relations
  1. Performance
    1. Reality show
    2. Entertainment
    3. De-realization/Unreality
  1. Miscellaneous
  2. Resistance
    1. Violence
    2. Mythic themes
  1. Persecution and Purge
    1. Retaliation/Revenge
    2. Internment/Kidnapping
    3. Impotence
  1. Racism/White Nationalism
    1. Genocide
  1. 2020
  2. Reparation/Repair

 

45 Dreams 6/2018


I’m backstage, and have infiltrated a President Trump rally. He’s giving his usual boisterous speech to an adoring crowd. I’m on his right, crouched down, and I can see him through the wings. He has pulled out his penis and is masturbating during the speech behind the podium. The audience can’t see this, but the people backstage can. There’s another man in the wings near me who is a New York Times reporter. There’s also some Trump secret service guards. Trump masturbates throughout the speech and at the end ejaculates onto the speech. I take photos and video of this and I’m determined to post them on Facebook and Youtube. I’m worried about getting caught filming by the guards and stopped. I think it’s crucial that this is revealed to the public. Outside, I ask the reporter if he’s going to take the story to the New York Times. He’s unsure and says “I don’t know.” This is frustrating to me. He then runs off down the street. I get the impression he is going to go ahead and do it. I upload the videos to social media. I’m thinking surely this must be the thing that takes him down. 
*******************
I dreamt about Melania Trump was in the hospital–which she was–but the true reason wasn’t what was released to the public. I knew the real reason because I was her treating physician. Melania had an unexpected unplanned pregnancy and wanted to terminate the pregnancy. Her husband saw this fetus as the harbinger of good luck and his supremacy and his ability to make America great. She saw the fetus as an unwanted burden of a husband that doesn’t love her. I agreed to terminate the pregnancy for her and agreed to protect her privacy by releasing that she had undergone a routine kidney procedure.